SWAIMinutes20091203

From OpenFlow Wiki

Jump to: navigation, search

Contents

Meeting Minutes for SWAI, 3 December 2009

Present

Glen, Guido, Tatsuya, Yiannis, Dave, Dan T, Mikio

Miscellaneous

David E not here next week.

Brain stormed on 1.0 tee shirt. Something involving commit hash identifiers seems to have some interest. Maybe a mosaic of pictures of contributors.

Follow-up on Action Items

From previous meeting (11/19):

  • Begin/organize review of test framework (David, Guido) Deferred
  • Send out status email to OF spec (Glen) DONE
  • Identify reviewers for each 1.0 feature (Glen)
  • Get date from Rob S for slicing flowvisor complete (Yiannis) DONE; this Friday
  • Config protocol:
    • Date from Nicira for code availability for switch side (Guido) DONE
    • Date for Integration of switch side code (Glen) Tracked in 1.0 OF mtg
    • Date from Nicira for Controller side code availability (Guido) Tracked in 1.0 OF mtg
  • Organize meeting for testing on or near 12/1: How to test in production (Guido) DONE
  • Get NOX ETA for 1.0 features: (Glen) DONE
  • Update 1.0 features table to remove deferred items (Glen) DONE

Action Items

  • Email Nicira about code availability (Glen) DONE
  • Double check that NOX completions mean full integration, not wireline compat (Guido) OKAY
  • Three spec items still open (Brandon?) DONE
  • Add note about kernel implementation in reference tree (Glen)
  • Clarify NOX 1.0 wire compatibility availability (Glen/Guido) DONE nox-for-v1.0 in our nox repo based on nox-0.6.
  • Need a tee shirt design for OpenFlow 1.0 release. (Glen, Guido, David E)