Views
SWAIMinutes20091210
From OpenFlow Wiki
Contents |
Meeting Minutes for SWAI, 10 December 2009
Present
Brandon, Guido, Bob L, Mikio, Tatsuya, Dan T, Glen G
Follow-up on Action Items
OpenFlow 1.0 Status
Config protocol is deferred to 1.0.5.
Coding done for ref implementation, nox and flow visor (last not run yet).
Need to test building on various Linux platforms.
There's an ETA for ref switch column for the v1.0 status page;
Status of flowvisor checked: Slicing support is written, but not yet fully tested.
Miscellaneous
Test discussion deferred to its own meeting.
Discussed Bob's mininet tool: various topologies discussed and current performance work. Currently using kernel implemenation for datapath.
Action Items
- Add note about kernel implementation in reference tree (Glen)
- Test building on multiple Linux platforms (Glen)
- Tee shirt design still pending
