Meeting Minutes for SWAI, 19 November 2009
Present
Glen, Guido, Tatsuya, Bob L, Yiannis, Dave, Brandon, Dan T, Mikio
Reviewed 1.0 Status
- Slicing
- Brandon reviewing;
- need Rob S date for FlowVisor
- Testing needs to try an enqueue action if there is one or more queues
- Config protocol
- Issue in communication between database and openvswitchd component
- Long discussion about partitioning of these parts
- Does the database represent the physical switch or a datapath (virtual switch)
- Need to clarify our understanding of the high level architecture
- ETA was 4 days ago; want testing in 11 days; can we do this?
- Need resource for NOX side scripts to exercise config protocol
- Identified reviewers
- Spec clarifications
- Identify any matters that require code changes and which should be bumped up
- Trade-off: Getting it right vs getting it out
- Goal: Close issues by next Tuesday 11/24
Bob's Demo
A 1000 node OF Network onto a laptop.
- Network research platform
- Virtualization for testing
- Use processes for virtualization and veth interfaces
- >500 Mbps datarates between machines in this demo
Follow-up on previous Action Items
- Have some slicing test results showing sliced traffic distribution (Yiannis) DONE
- Begin/organize review of test framework (David, Guido)
- Need a tee shirt design for OpenFlow 1.0 release. (Glen, Guido, David E)
- Send out e-mail about code reviews and follow up with implementers (Glen)
- Add Done column for NOX in 1.0 status table (Glen)
- Send reminder for NOX features -- fill in ETA column (Glen)
- Add note about kernel implementation in reference tree (Glen) Still to do
Actions
- Begin/organize review of test framework (David, Guido)
- Add note about kernel implementation in reference tree (Glen)
- Send out status email to OF spec (Glen)
- Identify reviewers for each 1.0 feature (Glen)
- Get date from Rob S for slicing flowvisor complete (Yiannis)
- Config protocol:
- Date from Nicira for code availability for switch side (Guido)
- Date for Integration of switch side code (Glen)
- Date from Nicira for Controller side code availability (Guido)
- Organize meeting for testing on or near 12/1: How to test in production (Guido)
- Get NOX ETA for 1.0 features: (Glen)
- Flow Cookies,
- Port number for stats,
- Flow duration,
- IP TOS matching
- Update 1.0 features table to remove deferred items (Glen)
- Clarify NOX 1.0 wire compatibility availability (Glen/Guido)
- Need a tee shirt design for OpenFlow 1.0 release. (Glen, Guido, David E)